Source A: an original contemporary non-fiction-style account.
The council archive invited volunteers to record the writing inside a disused railway tunnel before renovation began. Although trains had not used it for decades, we could not simply arrive with torches and explore. An engineer unlocked the gate at eight, checked our helmets and explained that she would decide which sections were safe to enter. Contractors were due on Monday, so this Saturday morning was our only opportunity to complete the record.
We worked in pairs. One person placed a numbered card beside each inscription without touching it; the other photographed the wall and entered the number, location and visible words on a tablet. At first, I wanted to concentrate on the elaborate dates and carefully carved names. Our coordinator reminded me that repeated initials and faint pencil marks mattered too. Once the walls had been cleaned and repaired, nobody could return to check what we had overlooked.
The work was slower than I had expected. Water on the floor forced us to move equipment several times, while the engineer stopped us whenever she heard loose material falling. There was no prize for finding the oldest inscription and nothing could be removed. At eleven, she called us back to the entrance even though several of us wanted another hour. We left with muddy boots, hundreds of photographs and the uncomfortable knowledge that our incomplete record would soon be the only version available.
Source B: an original letter in a nineteenth-century voice. This is a period-voice simulation, not an archival document.
My dear brother, my inspection of the north tunnel continues on the first Thursday of every month. I enter after the final train has passed and must be clear before the early goods service. The company pays me to find cracked bricks, displaced stones and places where water has entered. Having walked the same passage so often, I know which stretches usually remain dry and which demand a closer lamp.
Last Thursday, a fresh line appeared across the roof near the middle of the tunnel. I marked the place in chalk, measured its length and entered it in my book. Two labourers waited near the entrance, and I sent one to bring timber while the other remained with me. We supported the damaged section that night. Had I merely recorded it for later consideration, the superintendent would rightly have asked why I had failed to act.
There are names and dates scratched into many of the bricks, but these do not belong in my report unless the brick itself is failing. I occasionally wonder who made them, particularly those that seem older than the railway, yet curiosity cannot delay the inspection. What I miss this month may still be visible when I return, but a fault that worsens before morning would be laid at my door.
Use details from both sources. Write a summary of the differences between the two writers’ situations when they examine the tunnels.
508 exam-style questions on AQA GCSE English Language 6.2 Content, covering 6.2.1 Reading sources: non-fiction and literary non-fiction, 6.2.2 Time periods of the sources, 6.2.3 Choice of genre, and 6.2.4 Section B writing task. Each one has a worked solution and a mark scheme showing where the marks go.