A stage lighting system has an alternating backup supply. The backup supply has the same frequency as the UK domestic mains supply. During a test, it completes 21 full cycles.
How long does the test last?
21 s
0.42 s
2.4 s
1050 s
95 exam-style questions on AQA GCSE Physics 2.3 Domestic uses and safety, covering 2.3.1 Direct and alternating potential difference and 2.3.2 Mains electricity. Each one has a worked solution and a mark scheme showing where the marks go.