A cable manufacturer has 12 tonnes of separated scrap copper. The manufacturer will send the copper to a recycling facility only if this uses at least 75% less energy than producing the same mass of copper from ore.
| Process | Energy used |
|---|---|
| producing 1 tonne of copper from ore | 45 GJ |
| recycling 1 tonne of copper at the facility | 7 GJ |
| collecting and transporting the 12 tonnes of scrap | 36 GJ |
Use the data to show whether the manufacturer should send the scrap copper to the recycling facility.
121 exam-style questions on Edexcel GCSE Chemistry 5.1 Obtaining and using metals, covering 5.1.1 The reactivity series of metals, 5.1.2 Displacement reactions as redox reactions, 5.1.3 Extracting metals from ores by reduction, 5.1.4 Biological methods of metal extraction, 5.1.5 Resistance to oxidation and recycling metals, and 5.1.6 Life cycle assessment. Each one has a worked solution and a mark scheme showing where the marks go.