A metal recovery plant processes copper-containing waste from several sources.
The plant recovers copper from old electrical cable.
| Quantity | Value |
|---|---|
| mass of old cable processed | 25 tonnes |
| percentage of the cable that is copper | 60% |
| percentage of the copper recovered | 80% |
State two environmental advantages of recovering copper from waste rather than extracting copper from ore.
Calculate the mass of copper recovered from the 25 tonnes of old cable.
Give your answer in tonnes.
A shipment of copper ore has a mass of 360 tonnes. The ore contains 1.5% copper by mass.
Calculate the mass of copper in the shipment.
Give your answer in tonnes.
The plant is offered a batch of copper-containing scrap.
| Information about the batch | Value |
|---|---|
| estimated value of the recovered copper | £6400 |
| estimated collection and transport cost | £7100 |
| condition of the scrap | mixed with heavily contaminated materials |
The manager decides not to accept this batch.
Suggest two reasons why the information supports this decision.
Silver is recovered from a solution containing silver ions.
The half equation for the change is
Ag++e−→Ag\mathrm{Ag^{+}} + \mathrm{e^{-}} \rightarrow \mathrm{Ag}Ag++e−→Ag
State whether the silver ions are oxidised or reduced.
The plant also recovers copper by electrolysis of a solution containing copper ions. In one run, 63 500 g of copper is deposited at the cathode.
Relative atomic mass: Cu = 63.5
Calculate the amount, in moles, of copper deposited.
During this run, 1 mole of oxygen forms at the anode for every 2 moles of copper deposited.
One mole of any gas occupies 24 dm3\mathrm{dm^{3}}dm3 at room temperature and pressure.
Calculate the volume of oxygen produced during this run.
Give your answer in dm3\mathrm{dm^{3}}dm3.
121 exam-style questions on Edexcel GCSE Chemistry 5.1 Obtaining and using metals, covering 5.1.1 The reactivity series of metals, 5.1.2 Displacement reactions as redox reactions, 5.1.3 Extracting metals from ores by reduction, 5.1.4 Biological methods of metal extraction, 5.1.5 Resistance to oxidation and recycling metals, and 5.1.6 Life cycle assessment. Each one has a worked solution and a mark scheme showing where the marks go.