A company tests metals P and Q for protecting a buried steel pipeline. Three identical sections of pipe are left in the same damp soil for 30 days.
| Metal attached to the steel | Initial mass of metal block in g | Mass of metal block after 30 days in g | Area of steel covered by rust after 30 days in cm² |
|---|---|---|---|
| no metal | — | — | 36 |
| P | 1800.0 | 1788.0 | 0 |
| Q | 1800.0 | 1799.5 | 32 |
Explain which metal, P or Q, should be attached to the pipeline to provide sacrificial protection.
A new block of the metal selected in (a) has a mass of 1800 g. Assume that it continues to corrode at the same average rate as in the test.
Calculate the maximum time, in years, before the block is completely used up.
Use 365 days = 1 year.
Give your answer to three significant figures.
105 exam-style questions on Edexcel GCSE Chemistry 6.1 Transition metals, alloys and corrosion, covering 6.1.1 Properties of transition metals, 6.1.2 Corrosion and its prevention, and 6.1.3 Alloys and the uses of metals. Each one has a worked solution and a mark scheme showing where the marks go.