Legal controls: the law decides which sites are possible at all
Definition
Planning permission: Official approval from the local authority that a business needs before it can put up a new building, extend an existing one or change what a building is used for.
- Legal controls work as a filter applied before cost and footfall are compared, because a site the law forbids is not an option however attractive it looks.
- An application can take months to decide, so a firm that has already signed a lease pays rent on premises it is not allowed to open.
- Permission is often granted with conditions attached, such as limited opening hours or a smaller sign than the owner wanted, and those conditions cut the revenue the site can earn.
- Changing what a building is used for needs approval as well, so an empty shop cannot simply become a hot food takeaway or a nursery.
Common Mistake
- Do not treat planning permission as a formality, because a council can refuse it outright or attach conditions that cut the hours the site is allowed to trade.
- A cheap site is not a real option until the law allows this particular activity there, so check the legal position before comparing rents.
Zoning: where factories may and may not be built
- Local authorities divide land into zones for housing, retail and industry, and heavy manufacturing is normally confined to designated industrial estates away from homes and schools.
- That leaves a manufacturer choosing between a handful of permitted sites rather than the whole area, and competition for those sites pushes their rents up.
- Protected land such as green belt or national park is closed to building altogether, which is why firms wanting to expand often buy an existing unit rather than develop a fresh site.
- Zoning can therefore push a business further from its customers or its labour supply, so transport costs or wages end up higher than the firm planned.
Environmental limits: what a site may release, and when it may run
- Limits on what may be released into the air, and on what may be discharged into rivers and drains, force a plant to fit filters and treatment equipment before it can operate.
- That equipment is a large one-off cost plus ongoing maintenance, and it may make a site that looked cheap the more expensive of two options.
- Noise and traffic rules near housing can stop night working, so a factory that needed three shifts to be profitable is capped at two and produces less from the same building.
- Breaking these controls brings fines, orders to stop production and in serious cases removal of the licence to operate, so the cost of ignoring them is far higher than the cost of meeting them.
Example
- Suppose a food processor compares a riverside site at £40,000 a year rent with an industrial estate unit at £55,000.
- The cheaper site discharges into the river, so it needs a £120,000 water treatment unit before it can open, while the estate unit connects to an existing industrial drain.
- The £15,000 a year saved on rent takes eight years to cover that equipment, so the site that looked cheaper is the dearer choice.
Recommending a location: what should decide it
- Start from what the business actually does, because a manufacturer moving heavy materials cannot escape transport costs and a shop without passing customers has no way to earn revenue at all.
- Then set the factors against the money available, since rent is a fixed cost that must be paid in the quiet early months when a new business has few customers.
- A thinly financed start-up is usually better on the cheaper site, because low fixed costs mean it needs to sell fewer units each month to break even and can survive slow trade.
- An established firm with cash reserves can afford the expensive site, because it can wait for the site to build a customer base and its brand already pulls people in.
- Take a new bakery deciding between a high-street unit at £2,400 a month and a side-street unit at £900, with savings of £20,000 and no other income.
- The side street is the better recommendation here, because the £1,500 saved each month buys more than a year of extra survival time out of those savings, and bread and cakes are bought by regulars who will walk an extra street for them.
- The answer would flip if the product depended on impulse buying by strangers, since a side street would then leave the bakery invisible to the people who buy on sight.
- Whichever site wins on cost and customers, it is only a real option once planning permission, zoning and any pollution controls have been checked.
Exam technique
- Legal controls are usually forgotten in location answers, so name a specific one such as refusal of planning permission rather than writing vaguely about government rules.
- Choosing the dearer site because it is better leaves the recommendation unsupported, so tie the choice to the money the business has and how long it can trade at a loss.
- Use the rent figures you are given and compare them, because saying one site is cheaper without the gap in pounds is not evidence.
- Sitting on the fence leaves the decision unmade, so pick one site and say what would have to change for the other to win.
Self review
- What is planning permission and when does a business need it?
- Explain one way zoning rules limit where a factory can be built.
- How can pollution controls raise the cost of using a site?
- Why is a site that the law forbids not an option even when its rent is lowest?
- Why might a start-up with little cash choose a cheaper site with less passing trade?