Skip to content

Course home

Question bank·3.1.3 Short and extended response question types
Sign up

3.1.3 Short and extended response question types

EasyMediumHard
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256257258259260261
Question 45

A garden still being made

Text One: A visitor’s account of an unfinished community garden.

The community garden opened on the first Saturday in May, although much of it still looked like a plan waiting to become real. Wooden stakes marked the future pond, the climbing frame for the roses was bare and trays of plants stood beside freshly dug beds. A board at the entrance showed what would be added during the summer, so nobody had been promised a completed garden.

Watching the work made details noticeable. A gardener demonstrated how the paths were being edged, while another explained why some beds had been left empty. When a visitor found that her pushchair would not pass comfortably between two corners, a volunteer measured the gap and marked a wider route in chalk. Ropes protected newly sown ground, and visitors used a separate path whenever wheelbarrows were moving.

I returned six weeks later. The pond had been filled, young plants covered beds that I had seen as bare soil and the narrow corner had been altered. Because I remembered the earlier visit, these changes felt like stages in a process rather than features that had simply appeared.

Text Two: A report on opening part of a town garden during redevelopment.

During the redevelopment of a town garden, one section remained open on selected days. Barriers separated visitors from machinery, and the public route was temporarily closed whenever materials had to be moved across it. These arrangements protected visitors, but they also interrupted the work. Some deliveries had to take place before opening, and a member of staff was assigned to monitor the route instead of helping with planting.

Public access nevertheless influenced the finished garden. Visitors reported that rainwater gathered beside a new bench and that several temporary labels were difficult to read. The bench was moved to firmer ground and the final labels were placed lower. Booking records also showed that some people returned several times because they wanted to follow the garden’s development.

Responses were not entirely favourable. Some visitors enjoyed seeing practical work and discussing decisions with the gardeners. Others had expected a finished attraction and regarded the open section as neglected. Later publicity therefore stated more prominently that redevelopment was continuing and identified which areas would be incomplete.

Synthesise what you learn from both texts about opening gardens to visitors before all the work is complete.

[8]
Markscheme

3.1.3 Short and extended response question types Questions

  1. GCSE
  2. /English Language
  3. /3.1.3 Short and extended response question types

382 exam-style questions on WJEC GCSE English Language 3.1.3 Short and extended response question types. Each one has a worked solution and a mark scheme showing where the marks go.

More questions