Skip to content

Course home

Sign up

6 Radioactivity

EasyMediumHard
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153
Question 98

An automated production line applies a polymer coating to a moving sheet. A beta source and detector monitor the total thickness of the coated sheet. The detector count rate remains below the target value, although the source activity and the source-to-detector arrangement are unchanged. Opening the flow valve deposits more coating and closing it deposits less coating.

Which action should the coating control system take?

[1]
A

Close the flow valve so that less coating is deposited and the count rate rises to the target value.

B

Reset the target to the lower count rate without changing the amount of coating deposited.

C

Open the flow valve because a low count rate shows that the coating is too thin.

D

Open the flow valve so that more coating is deposited and the count rate rises to the target value.

Markscheme

6 Radioactivity Questions

  1. GCSE
  2. /Physics
  3. /6 Radioactivity

Question bank