Question 43
Easy

Figure 1 shows a crane hoisting a concrete block vertically upwards on a construction site.

The crane lifts the block through a vertical height of 1.5 m.

The work done against gravity on the concrete block is 5400 J.

Calculate the weight of the concrete block [2].

Use the equation:

work done=force×distance moved in the direction of the force \text{work done} = \text{force} \times \text{distance moved in the direction of the force} work done=force×distance moved in the direction of the force

Figure 1: A diagram schematic of a crane lifting a heavy rectangular concrete block vertically upward using a steel cable. The height of the lift is marked as 1.5 m.

[2]