Future Energy Initiatives in the Humber Green Energy Estuary

  • Offshore Wind Integration: Plans to construct a dedicated onshore transmission substation to import an additional 140,000 MWh of offshore wind power annually directly into the regional grid.
  • Industrial Hydrogen Blending: A pilot project to inject green hydrogen (produced via electrolysis from offshore wind) into the existing domestic gas network, initially serving 8,000 high-density homes.
  • Agricultural Bioenergy: A planned expansion of anaerobic digestion facilities utilizing crop residues and animal manure from surrounding rural areas to generate electricity and district heating.
  • Municipal Solar & Heat Pump Retrofits: Retrofitting rooftop solar PV arrays and air-source heat pumps across 180 social housing blocks and civic buildings in Hull to combat fuel poverty.

Assess how urban regeneration and population growth in the Humber region could affect both the demand for and the development of the renewable energy projects outlined in the extract.

[6]
Markscheme

UK energy management & future supply Questions

  1. GCSE
  2. /Geography
  3. /UK energy management & future supply

14 exam-style questions on OCR A GCSE Geography UK energy management & future supply. Each one has a worked solution and a mark scheme showing where the marks go.

Question bank