Skip to content

Course home

4.6 Integration (A-level only)

4.6 Integration (A-level only)

MediumHard
123456789101112131415161718192021222324252627282930
Question 8

An industrial desalination plant monitors the mass of salt extracted from seawater. The process is modeled by two variables:

  • ttt, the number of hours the plant has been operating since its daily maintenance cycle at 08:00.
  • SSS, the total mass of salt, in kg, extracted since 08:00.

The engineers model the rate of salt extraction as being directly proportional to 10−tS\displaystyle \frac{10 - t}{S}S10−t​.

After 2 hours of operation, the rate of salt extraction is 803\displaystyle \frac{80}{3}380​ kg per hour and the total mass of salt extracted is 120 kg.

a.

Show that SdSdt=400(10−t)\displaystyle S \frac{dS}{dt} = 400(10 - t)SdtdS​=400(10−t).

[3]
b.

Hence, show that S2=400t(20−t)S^2 = 400t(20 - t)S2=400t(20−t).

[4]
c.

The plant began its operation at 08:00. (i) The plant's efficiency drops over time. The operation is paused for a second maintenance cycle when the rate of salt extraction falls below 15 kg per hour. Using the results in parts (a) and (b), calculate the time of day when the operation is paused. (ii) Explain why the model used by the engineers is not valid at the start of the process (08:00).

[5]
Markscheme

4.6 Integration (A-level only) Questions

  1. A Level
  2. /Maths
  3. /4.6 Integration (A-level only)

92 exam-style questions on WJEC A Level Maths 4.6 Integration (A-level only), covering 4.6.1 Integration (A-level only) and 4.6.2 Integration (A-level only). Each one has a worked solution and a mark scheme showing where the marks go.

Question bank