A subterranean survey records the following data relative to a fixed origin OOO:
Units are measured in decametres.
Find a vector equation for the line lll representing the tunnel.
A side-shaft is planned to run from PPP to a point CCC on lll such that PCPCPC is perpendicular to lll. Determine the coordinates of CCC.
A pressure sensor is placed at the point P′P'P′, where P′P'P′ is the reflection of PPP in the line lll. Find the coordinates of P′P'P′.
Hence, calculate the distance between the mineral deposit and the sensor, ∣PP′→∣|\overrightarrow{PP'}|∣PP′∣, giving your answer as a simplified surd.
168 exam-style questions on OCR (MEI) A Level Maths 1.11 Vectors, covering 1.11.1 Language of vectors in two dimensions, 1.11.2 Add, subtract and scale vectors, 1.11.3 Magnitude and direction of a vector, 1.11.4 Position vectors, 1.11.5 Distance between points by position vectors, 1.11.6 Vectors to solve problems, 1.11.7 Language of vectors in three dimensions (A-level only), and 1.11 Vectors. Each one has a worked solution and a mark scheme showing where the marks go.