Question 21

The annual carbon sequestration capacity of a geo-engineering facility is being scaled up to combat climate change. At the start of the project, the facility captures 12 500 tonnes of CO2\text{CO}_2CO2​ per year. Exactly six years after the start of monitoring, the annual capacity has reached 18 200 tonnes.

A model assumes that the annual capacity increases by g% g \%\,g% each year, such that the sequence of capacities at the end of each year follows a geometric sequence.

Assuming the model:

a.

Calculate the value of ggg, giving your answer to 2 decimal places.

[3]
b.

According to the model, after N N\,N years of monitoring, the annual capacity first exceeds 50 000 tonnes. Determine, showing all steps in your working, the smallest integer value of NNN.

[4]
Markscheme

1.6.15 Standard formulae for geometric series (A-level only) Questions

  1. A Level
  2. /Maths
  3. /1.6.15 Standard formulae for geometric series (A-level only)

22 exam-style questions on OCR (MEI) A Level Maths 1.6.15 Standard formulae for geometric series (A-level only). Each one has a worked solution and a mark scheme showing where the marks go.

Question bank