Skip to content
MathsGenie logo
Quick links
Open app

Course home

  1. A Level
  2. Maths OCR
  3. Question bank

1.7.20 Constructing differential equations (A-level only)

MediumHard
123456789101112131415161718192021222324252627282930313233343536373839404142
Question 23

An environmental scientist is monitoring the breakdown of a pollutant in a controlled bioremediation tank. The concentration of the pollutant PPP parts per million (ppm) at time ttt hours after the treatment begins is modelled by the equation:

P=10(5+λe−kt) P = 10(5 + \lambda e^{-kt}) P=10(5+λe−kt)

where λ\lambdaλ and kkk are positive constants.

Initially, the concentration of the pollutant is 200200200 ppm. After 7 hours, the concentration falls to 140140140 ppm.

a.

Find the concentration of the pollutant after 24 hours. Give your answer to three significant figures.

[4]
bi.

Determine the limiting concentration of the pollutant as t→∞t \to \inftyt→∞, giving a reason for your answer.

[2]
bii.

Find the time taken, in hours, for the concentration to fall to 555 ppm above the limiting concentration.

[3]
c.

Explain why the model might need to be adjusted if the remediation process was conducted in an outdoor reservoir.

[1]

1.7.20 Constructing differential equations (A-level only) Questions

  1. A Level
  2. /Maths
  3. /1.7.20 Constructing differential equations (A-level only)