A subterranean survey records the following data relative to a fixed origin OOO:
Units are measured in decametres.
Find a vector equation for the line lll representing the tunnel.
A side-shaft is planned to run from PPP to a point CCC on lll such that PCPCPC is perpendicular to lll. Determine the coordinates of CCC.
A pressure sensor is placed at the point P′P'P′, where P′P'P′ is the reflection of PPP in the line lll. Find the coordinates of P′P'P′.
Hence, calculate the distance between the mineral deposit and the sensor, ∣PP′⃗∣|\vec{PP'}|∣PP′∣, giving your answer as a simplified surd.
Practise Edexcel A Level Maths Vectors with exam-style questions for A Level Maths. 123 questions covering 11.1 Vectors, 11.2 Representing Vectors, 11.3 Magnitude and Direction, 11.4 Position Vectors, 11.5 Solving Geometric Problems, and 11.6 Modelling with Vectors, matched to the Edexcel A Level Maths (9MA0) specification and written in Paper 1, Paper 2 and Paper 3 style. Every question includes a full worked solution and mark scheme, so you can see where marks are awarded rather than just whether you got the answer right.