0/7

The annual carbon sequestration capacity of a geo-engineering facility is being scaled up to combat climate change. At the start of the project, the facility captures 12 500 tonnes of CO2\text{CO}_2CO2​ per year. Exactly six years after the start of monitoring, the annual capacity has reached 18 200 tonnes.

A model assumes that the annual capacity increases by g% g \%\,g% each year, such that the sequence of capacities at the end of each year follows a geometric sequence.

Assuming the model:

a.

Calculate the value of ggg, giving your answer to 2 decimal places.

[3]
b.

According to the model, after N N\,N years of monitoring, the annual capacity first exceeds 50 000 tonnes. Determine, showing all steps in your working, the smallest integer value of NNN.

[4]

3.4 Geometric Series Questions

Practise Edexcel A Level Maths 3.4 Geometric Series with exam-style questions for A Level Maths. 27 questions, matched to the Edexcel A Level Maths (9MA0) specification and written in Paper 1, Paper 2 and Paper 3 style. Every question includes a full worked solution and mark scheme, so you can see where marks are awarded rather than just whether you got the answer right.

PreviousNext

3.4 Geometric Series Questions

  1. A Level
  2. /Maths
  3. /3.4 Geometric Series