An offshore wind farm project is planned to increase its annual energy production capacity over a 16-year period.
Model A assumes that the annual energy production will increase by the same fixed amount each year.
According to model A, determine the farm's predicted annual energy production in year 2.
Model B assumes that the annual energy production will increase by the same percentage each year.
According to model B, determine the farm's predicted annual energy production in year 2. Give your answer to the nearest GWh.
Calculate the difference between the total energy predicted to be generated from year 1 to year 16 inclusive under the two models. Give your answer to the nearest 10 GWh.
308 exam-style questions on AQA A Level Maths 1.7 D: Sequences and series, covering 1.7.1 Binomial expansion, 1.7.2 Types of sequence (A-level only), 1.7.3 Sigma notation (A-level only), 1.7.4 Arithmetic sequences and series (A-level only), 1.7.5 Geometric sequences and series (A-level only), and 1.7.6 Sequences and series in modelling (A-level only). Each one has a worked solution and a mark scheme showing where the marks go.